How is the easement used in the design of the South Reinforcement Transmission Line?

How is the easement used in the design of the South Reinforcement Transmission Line?

The newly acquired easement will be utilized by BWL to design the new transmission line route. The transmission line will be designed in accordance with the available widths throughout the corridor, either in public road right-of-way or on private easements from the landowners.