Why is the contractor required to obtain a Permit from the City/Municipality?
The Customer is responsible for obtaining inspections on work done to their electrical system as required by the local inspection authority.
The Customer is responsible for obtaining inspections on work done to their electrical system as required by the local inspection authority.